The
tower was built for the first time in the country by Fateh Sanat Kimia Petrochemical
Company whose delivery operation to the petrochemical plant began in June.
Mohammad
Taher Ahangari, CEO of Siraf Energy Petrochemical Company, while emphasizing
support for national manufacturing and independence from foreign sources, said:
"The tower weighs 400 tons, is 7 meters long in diameter and 70 meters long
in height and will be installed in the near future by powerful Iranian forces
in the distillation area of the petrochemical project."
Ahangari
stated that so far more than 70% of the resources allocated from the National
Development Fund of Iran for the construction of this project has been procured
through contracts with powerful domestic companies.
The
CEO of the petrochemical plant also continued, “The construction of the ASU
unit of this complex will be done for the first time in the country by domestic
companies, which will be a big step in the practical realization of the slogan
of production leap and economy of resilience.”