According to Masjid Suleiman Petrochemical Plant, Hossein Salehinia,
the director of Masjid Suleiman Petrochemical Complex, said: “This pump, which
was 100% made abroad, was not able to provide operational service a few months
ago.
He added: “According to the technical reviews inside the complex and
the quality assessment of some manufacturers in the country, this pump was
generally made in the country.”
The director of Masjid Suleiman Petrochemical Complex stated that the
output pressure of this pump is 250 bar, and said: “In this project, about 45%
of the cost of the foreign sample of this pump has been saved.”